Mercedes Benz, Parts Distribution Center, Robbinsville, NJ

Add to Brochure

Syska Hennessy Group provided engineering and technology design services for Mercedes Benz’s expansion of its NJ based Parts Distribution Facility serving after-market parts storage and distribution across North America. The existing 472,000 sf facility was expanded by an additional 153,600 sf while remaining fully operational.

The project scope included extension of the existing ESFR sprinkler system, warehouse smoke ventilation, expansion of the electrical distribution including forklift charging stations, a new 250kW diesel generator, new staff lounge facilities and office space, and energy efficient LED lighting and controls. In addition to MEP Design, Syska also provided technology design services create a new IDF room and 20kVA UPS to serve the expansion. The new IDF included redundant power as well as cooling.

 

Size
153,600 sf

Architect
Gensler

Services/Features
Mechanical
Electrical
Plumbing
Fire Protection
Fire Alarm and Life Safety
IT/Telecommunications